Monolev SCIP | The Construction System That Changes Everything
The New Construction System Taking Over the World

Monolev SCIP Is the
Construction System
The World Has Been Waiting For.

A new construction system is solving the biggest problems in the industry — labor shortages, climate disasters, rising costs, and slow timelines. Monolev SCIP outperforms Stick-Frame, ICF, and CMU in every measurable category. With 4 people, you erect the walls of a 1,300 sq ft house in a single day.

1 Day
Walls of 1,300 sq ft · 4 People
200+
mph Wind Rated
4-Hour
Fire Resistance
No prior experience needed  ·  7-Day guarantee  ·  Trained by the manufacturer
What One Panel Delivers 1,300 sq ft · 1 Day · 4 People
Wind ResistanceCategory 5 Certified
200+ mph
Fire ResistanceNon-Combustible Assembly
4 Hours
Structural StrengthCompressive · Field Proven
3,600 PSI
Load per PanelMulti-Story Construction
55 Short Tons
Acoustic RatingSTC Standard
STC 40
Thermal InsulationNo Thermal Bridging
R-Value Superior
Panel Weight1 Worker Can Handle It
28.6 lbs
Wall Erection1,300 sq ft House · 4 People
1 Day
Full Buildvs. 6 Months Conventional
37 Days
$95B
Hurricane losses / year
Mostly stick-frame
$16B
Wildfire losses / year
Wood ignites at 572°F
500K
Unfilled jobs in 2025
AGC / Deloitte data
−30%
Productivity since 1970
Richmond Fed 2025
Before You Read the Specs — Watch This

You've Never Seen a Wall
Built Like This Before.

One construction system replaces stick-frame, ICF, and CMU — delivering complete buildings faster, with fewer people, and with performance no conventional system can match. Watch it build a complete structure before you decide anything.

What is Monolev SCIP
▶ What Is Monolev SCIP · 2-Min Overview · ISOCIL Engineering Team
Three Components. One Monolithic Wall.
Component 01
🔩
Electro-Welded Steel Mesh
240+ Connection Pins · Both Faces · Galvanized

High-tensile galvanized steel wire machine-welded at 240+ intersection points per panel. Superior to the steel used in conventional beams and columns. Creates a continuously rigid diaphragm on both faces — distributing every load across the entire wall plane. No weak points.

Component 02
🧱
EPS Insulation Core
R-Value Superior · STC 40 · Anti-Fungal · Lightweight

Expanded polystyrene core delivers continuous insulation with no thermal bridging — uniform from floor to ceiling in any climate. Also contributes STC 40 acoustic separation and weighs only 28.6 lbs per panel. One worker handles it in any terrain.

Component 03
💪
Structural Shotcrete
3,600 PSI · Applied Both Faces · Monolithic Result

Structural concrete projected to both faces on-site. At full cure: 3,600 PSI compressive strength, 55 short tons of vertical load per panel, and 4-hour fire resistance. The shotcrete is what transforms the assembly into a single monolithic structure — no joints, no separation between layers.

Why This System Exists

Stick-Frame, ICF, and CMU
Were Not Built for This World.

Stick-frame (2×6 wood framing) is the standard in 90% of American homes. ICF (Insulated Concrete Form) helps with insulation but is slow and expensive. CMU (Concrete Masonry Unit) adds dead load without performance. None of them were engineered for today's climate, today's labor shortage, or today's energy codes — and none of them build a complete structure as fast, as safe, or with as few workers as Monolev SCIP.

🏠
Stick-Frame
2×6 Wood Framing — 90% of US Homes

Burns at 572°F. Fails at 110 mph winds. Delivers R-6 effective insulation (not R-19). Zero ballistic resistance. Requires 15–20 workers and 6 months. The most common wall in America is also the most vulnerable.

→ Monolev: 200+ mph · 4-hr fire · 4 people · 37 days
🧱
ICF / CMU
Insulated Concrete Form & Masonry Block

ICF delivers good thermal but requires complex formwork, heavy concrete pours, and skilled crews. CMU adds structural load without insulation (R-2). Neither delivers hurricane, fire, seismic, ballistic, and acoustic performance together.

→ Monolev does all six in one panel, one day
👷
500K
Unfilled Construction Jobs · US 2025

88% of US contractors can't find skilled workers. Every conventional system still demands large specialized crews. The workforce isn't there — and the systems haven't adapted.

→ Monolev: 4 people erect a 1,300 sq ft house in 1 day
What This Wall Actually Does

One System. Complete Buildings.
Faster, Stronger, With Fewer People.

Houses. Multi-story buildings. Commercial developments. Public infrastructure. Monolev SCIP is a complete construction system — not a specialty product. It builds everything conventional construction builds, in less time, with fewer workers, and with performance no stick-frame, ICF, or CMU structure can match.

🌀
200+ mph
Cat. 5 Hurricane · SCIP Certified
Hurricane & High-Wind

Monolithic steel-concrete panel creates a continuous load path — no joints, no pull-through failures, no shear plane failures. Stick-frame fails at 110 mph. This doesn't.

Cat. 5 Saffir-SimpsonCoastal Sites
🔥
4 Hours
Non-Combustible Assembly
Fire Resistance — Zero Fuel

No wood. No combustible foam. No OSB. The panel doesn't burn and doesn't release toxic gas or smoke. Safe enough to build a fireplace inside a Monolev structure.

4-Hour RatedWUI Approved
🌍
SDC A–F
All Seismic Design Categories
Seismic & Earthquake

240+ electro-welded connection pins distribute seismic energy across the entire diaphragm — eliminating the point failures that collapse wood-frame buildings in Zone 4 events.

IBC SDC A–FASCE 7-22
🛡️
Ballistic
High-Caliber Resistant
Ballistic Protection

Steel mesh + 3,600 PSI concrete stops high-caliber projectiles — including .357 Magnum and .44 Magnum. Stick-frame offers zero ballistic resistance. Monolev turns your structure into a fortress.

High-Caliber ResistantSafe Room Capable
🌡️
R-Value+
No Thermal Bridging · All Climates
Thermal Insulation — Real Numbers

EPS core delivers continuous insulation with zero thermal bridging — uniform from floor to ceiling. 2×6 framing delivers R-6 effective (not R-19). Monolev cuts HVAC load by up to 40%.

Zero Thermal BridgingAll 8 Climate Zones
🔇
STC 40
Acoustic Rating · Field Certified
Acoustic Separation

STC 40 certified. In multifamily, hospitality, and commercial construction, what happens in one unit is completely inaudible in the next. Standard stud walls deliver STC 33.

STC 40 CertifiedMultifamily Ready
Head to Head

Conventional Construction vs. Monolev SCIP
Every Category. Every Project Type.

Stick-Frame Construction
Fails at 110 mph winds
Burns. Ignites at 572°F
Zero ballistic resistance
R-6 effective insulation
STC 33 acoustic rating
15–20 workers · 6 months
58% more structural load
VS
Hurricane

Fire

Ballistic

Thermal

Acoustic

Speed

Weight
Monolev SCIP
Certified to 200+ mph Cat. 5
Non-combustible. 4-hour rated
Stops .357 Magnum & .44 Magnum
R-Value superior. Zero bridging
STC 40 certified
4 people · 37 working days
58% lighter than masonry
Not a Laboratory. A Job Site.

Tested in the Field.
Proven Under Real Load.

Monolev SCIP hasn't just been tested in controlled conditions. It's been deployed in real construction projects — under real structural loads, in real conditions — and delivered.

Project 01
3-Story Building — No Beams. No Columns.

A 3-story structure built entirely with Monolev SCIP panels — without interior columns or structural beams. Every floor load transferred through the monolithic structure alone — no beams, no columns.

Multi-Story · No Interior Columns
Project 02
7-Story Building — Construtora Canal

A 7-story residential building executed by Construtora Canal using the Monolev system as the primary structural wall assembly. Real load. Real floors. Real occupants.

7 Stories · Full Structural Load
Project 03
Amphitheater — Vale do Rio Doce

A large-scale public venue for Vale do Rio Doce built with the Monolev system — demonstrating performance at scale, in a high-footfall, acoustically-demanding environment.

Large Scale · Public Infrastructure
Monolev SCIP construction
Full Construction Sequence · Foundation to Finish · ISOCIL Engineering Team
The Bridge

The System Is Only as Fast
as the Team That Knows It.

37
Working Days · 4-Person Crew · Entire Build
Build Time
6 months37 days
Crew Size
15–20 workers4 people
Wind Rating
110 mph max200+ mph
Structural Load
Beams + columns55 short tons
Fire Rating
Burns4-Hour Rated

These numbers are real — but they only happen when the system is installed correctly. Wrong shotcrete mix. Incorrect connection sequence. Improper curing. These aren't hypotheticals — they're the field errors ISOCIL engineers see every month on job sites where someone "figured it out."

1
Learn the exact installation sequence

Foundation to finish — every step, every connection detail, every tolerance. The way the manufacturer builds it on 32,000+ projects per year with ISOCIL products.

2
Master structural shotcrete

The most common failure point in SCIP construction. Wrong mix ratios kill compressive strength. This course teaches exact proportions, application technique, and how to verify the 3,600 PSI result.

3
Get the documentation package

ASTM test summaries and IBC compliance documentation — formatted and ready for building department submittal. Stop explaining the system from scratch every time.

See the Training Program ↓
Who This Training Is For

Three Reasons to Learn
One System.

👷
For Contractors & Builders
Build Complete Structures — Faster Than Anyone

4 workers. 37 days. A finished building that survives Category 5 hurricanes, 4-hour fires, and earthquakes — at a fraction of the conventional crew size and timeline.

  • Cut crew from 15–20 to 4 workers
  • Cut timeline from 6 months to 37 days
  • Win projects your competitors can't staff
  • Charge a premium — and justify every dollar
📐
For Engineers & Architects
Specify the Wall That Does Everything

One wall assembly. Hurricane, seismic, fire, ballistic, thermal, and acoustic — all in one system, all in one specification. Qualify for projects no other wall can serve.

  • IBC 2021 / IRC 2021 / ASCE 7-22 compliant
  • Full documentation package for permit submittal
  • LEED v4 EA credit eligible
  • Spec it once. It handles every performance demand.
🏗️
For Companies & Developers
Adopt a New Standard. Train Your Crew.

Construction firms that adopt Monolev SCIP as a standard system reduce timeline, crew size, and material cost — while unlocking project types that wood-frame can never deliver.

  • Train entire crews to manufacturer's standard
  • Access ISOCIL engineers directly
  • First-mover advantage in your market
  • Enterprise session available — $3,000
The Complete Learning Path

From "What Is SCIP?" to
"I Can Build This Anywhere."

7 modules. 80+ lessons. Built by the engineers who manufacture the panel and have deployed it in real projects across three continents. No prior SCIP experience required.

Module 01
Introduction to SCIP Technology
  • How Monolev SCIP works vs. stick-frame, ICF, and CMU
  • Identifying certified panels vs. imitations
  • IBC / IRC / ASCE 7-22 code overview
Module 02
Tools, Materials & Mix Design
  • Required equipment for each installation phase
  • Structural shotcrete mix — exact proportions
  • Compatible materials and approved suppliers
Module 03
Foundation & Slab-on-Grade
  • Foundation sizing for 58% reduced dead load
  • Slab-on-grade execution and compaction
  • Base preparation for panel installation
Module 04
Panel Erection & Systems Integration
  • Correct panel erection sequence and bracing
  • MEP rough-in — plumbing and electrical
  • Panel modulation for maximum efficiency
Module 05
Advanced Applications
  • Swimming pool construction with SCIP
  • Double-height construction and execution
  • Special structural configurations
Module 06
Roof Assembly & Deck
  • Deck anchorage to SCIP bearing walls
  • Parapet and eave detailing
Module 07
Shotcrete & Finish
  • Correct shotcrete application technique
  • Achieving 3,600 PSI — verified 28-day cure
  • Finish preparation — no rework

Included With Every Enrollment

📊
Panel Quantity Calculator

Spreadsheet for accurate panel counts — use it directly on site.

👥
Certified Builder Community

12-month access to a closed network of ISOCIL-trained professionals.

🎙️
Direct Engineering Support

Submit technical questions to ISOCIL engineers during active projects.

📁
Documentation Package

ASTM summaries and IBC compliance letters for AHJ submittal.

Your Instructors

You're Learning From
The Engineers Who Built It.

Eng. Marano, Eng. Igor, and Eng. Rafael don't teach from textbooks. They teach from real projects, real failures, and the field experience of deploying this system at scale.

Eng. Marano Barros
Eng. Marano Barros
Lead Instructor · Structural Engineering

16+ years with the Monolev system. Supervised 200+ SCIP projects. Teaches the field errors that books can't cover — so you don't pay to learn them on your client's project.

16 Years200+ ProjectsLead Engineer
Eng. Igor
Eng. Igor
Instructor · Planning & Panel Modulation

Construction planning, panel modulation, and lean crew management. His methodology consistently delivers SCIP projects in 37 working days with 4-person crews.

Project PlanningPanel Modulation
Eng. Rafael
Eng. Rafael
Instructor · Shotcrete & Quality Control

Structural shotcrete application and quality control. The module most practitioners cite as the difference between passing and failing field inspection.

Shotcrete SpecialistQC & Inspection
From People Who Started Where You Are

They Didn't Know SCIP Either.
Here's What Happened.

"

I've studied several modern construction systems. Monolev SCIP is, without question, the most complete one I've encountered. The training gave me the technical depth to specify it with full confidence on my next project.

FG
Fabio Gomes
General Contractor
Fabio Gomes
"

As a structural engineer, I needed real technical backing — not marketing claims. ISOCIL's training is the only program with genuine test data, installation specificity, and documentation that holds up in plan review.

HS
Hugo S., P.E.
Structural Engineer
Hugo S.
"

The swimming pool and double-height modules opened applications I didn't think were possible with a panel system. This training directly expanded what my company can deliver. I recommend it to every serious contractor.

JE
Jorge Eduardo
Construction Manager
Jorge Eduardo
Get Certified

SCIP Is Entering the US Market.
The First Certified Builders Win.

Almost no one in the US is trained in this system yet. The contractors, engineers, and firms who get certified first will have a competitive advantage that can't be replicated by anyone who waits.

Individual Training · Official Certification
Monolev SCIP Complete Course
Foundation to finish — 7 modules · 80+ lessons · All levels
  • 7 modules — 80+ HD video lessons
  • Full build sequence: foundation → erection → shotcrete → finish
  • IBC 2021 / IRC 2021 / ASCE 7-22 compliance walkthrough
  • ASTM documentation package for permit submittals
  • Direct access to ISOCIL engineers
  • Certified Builder Community — 12 months
  • Panel Quantity Calculator spreadsheet
  • Lifetime access — free updates as codes change
  • Official ISOCIL Certification — issued by the manufacturer
Regular Price: $497
Limited Launch Pricing
$197
One-time · Instant access · All devices · Lifetime updates
Get Certified Now — Start Today →
🔒 Secure checkout · 256-bit SSL · Hotmart Platform
💳
Credit Card
🅿️
PayPal
📱
Apple/Google Pay
Buy Now, Pay Later: Affirm · Klarna · Afterpay — 4 × $49.25
🛡️ 7-day money-back guarantee — no questions asked. Zero risk.
For Companies & Firms
Need a Strategic Session Instead?

90-min live session with ISOCIL engineers. Project diagnosis, implementation roadmap, US import logistics, and crew training strategy. $197 course fee deducted if you also enroll.

Request Session — $3,000 →
Questions

Frequently Asked

What exactly is Monolev SCIP — and how is it different from stick-frame, ICF, and CMU?
+
Monolev SCIP (Structural Concrete Insulated Panel) is a wall assembly made of three factory-assembled components: a galvanized steel mesh with 240+ electro-welded connection pins, an EPS insulation core, and structural shotcrete applied to both faces on-site. Unlike stick-frame (combustible, fails at 110 mph, delivers R-6 effective insulation), SCIP is non-combustible, rated to 200+ mph, and delivers superior R-value with no thermal bridging. Unlike ICF (which requires a concrete pour into formwork), SCIP panels arrive pre-assembled and install in hours. Unlike CMU block (heavy, poor insulation), SCIP weighs 28.6 lbs per panel and delivers STC 40 acoustic separation.
Do I need prior SCIP or concrete experience?
+
No. Module 01 starts from zero — it explains what the system is and how it differs from every other wall assembly you've worked with. If you can read a set of construction drawings, you have everything you need to start. The course builds progressively from fundamentals to advanced applications including double-height construction and swimming pools.
Is the system compliant with US building codes — IBC, IRC, ASCE 7-22?
+
Yes. The system is engineered to IBC 2021 and IRC 2021 structural, energy, and fire provisions. Structural design follows ACI 318 for reinforced concrete walls. Wind and seismic loads are per ASCE 7-22. The training includes the full compliance path and provides ASTM documentation packages formatted for plan review and building department permit applications.
What's the difference between the $197 course and the $3,000 strategic session?
+
The $197 course is for individual practitioners — contractors, engineers, and architects who want to learn the system at their own pace across 80+ video lessons. The $3,000 strategic session is for companies and firms that want to adopt SCIP at scale — it's a live 90-minute session with ISOCIL engineers that includes project diagnosis, implementation roadmap, US import logistics, and crew training strategy. If you enroll in both, the $197 course fee is deducted from the session fee.
Can I pay in installments?
+
Yes. The $197 course supports Buy Now Pay Later through Affirm, Klarna, and Afterpay — typically 4 payments of $49.25 at 0% interest. Credit cards (Visa, MC, Amex, Discover), PayPal, Apple Pay, and Google Pay are all accepted through Hotmart's secure platform.
The first trained builders win

SCIP Is Coming to the US.
Get There First.

This system has been deployed in real projects — 3-story buildings without beams or columns, 7-story residential buildings, large-scale public infrastructure. It outperforms stick-frame on every measurable metric. Almost no one in the US is trained in it yet. For $197, you get there before the market catches up.

Get Certified Now — $197 →
7-Day Guarantee  ·  Instant Access  ·  Official ISOCIL Certification  ·  Lifetime Updates